Technical Improvements (2008-2010)
- Developing the H25.324 - Euro4
- Developing the H14.240 - Euro4
- Developing the H18.240 - Euro4
- Developing the H25.240 - Euro4
- S91 Midibus chassis - Euro5
Improvements in the computer system
- Engineering computer system (Pro/Engineer, AutoCAD)
- ORACLE production management system
Investments and improvements in the production technology
- Paint booth
- CNC lasercutter
- CNC edge bending
- CNC machining center
- CNC plasma cutter
- CNC tube bending machines
- Radial drilling machine
- Sawing machine
- Edge trimming machine
- Turning lathe
- Roll straightener
- Scouring machine
- 2 component painting machine
- Flame cutter
- 4 zone part washer
- 3D measuring device
- Vehicle examination line
- Output measuring bench
- Diagnostic devices
- Servicing tools
- Environmental protection investments